Sanctuary A/C Operation
This is part of the Ice Bank Chiller system located in the Office/Activity building. Ice is shared between the buildings. See the O/A system notes for more information.
-
1Univent Operation
- These are the perimeter HVAC blower units
- The control door is locked with a hex screw and the stubby screwdriver is in the Facility Director's office, top drawer, right of desk.
- Spring/Fall operation
- Set the units with core on cool and half of the rest half on heat and half on cool.
- This allows the thermostat to automatically switch from heat to cool if it is in auto mode.
- Set the units with core on cool and half of the rest half on heat and half on cool.
- Summer operation - all units on cool, note the PENCIL mark with a "C" (THIS IS ERASABLE IF CHANGE IS NECESSARY)
- The balcony unit runs full on with only the fan speed a variable. The thermostat is broken but since it is so hot upstairs it doesn't really require a thermostat.
- If it is ever too cold just turn the fan down or off.
- The balcony unit runs full on with only the fan speed a variable. The thermostat is broken but since it is so hot upstairs it doesn't really require a thermostat.
-
2Chilled Water Building Master ValveThis valve is located in the basement mechanical room where the piping enters the building. If the A/C is off, the valve should be closed. This reduces the cooling load during unoccupied times.